X

Generally, the substrate needs to be sufficiently smooth, stable and suitable for the chosen floor covering. Unevenness, cracks, old adhesive residues and other surface imperfections may show through thinner materials such as LVT and vinyl or affect the installation of carpet. Repairs, smoothing compounds or other preparation may be needed to achieve an appropriate finish.

Concrete and other cementitious substrates need to meet the moisture requirements specified by the flooring and preparation product manufacturers before installation. Excess moisture can affect adhesives, floor coverings and the long-term performance of the finished floor. Appropriate moisture testing helps establish whether the substrate is ready or whether further drying or moisture protection is required.

An uneven concrete surface may have visible dips, raised areas, cracks or changes in level. These imperfections can affect the finished appearance of flooring, particularly thinner coverings such as LVT and vinyl. A professional assessment can identify variations in the surface and establish whether repairs, smoothing or a levelling compound are needed before installation.

The time required depends on the existing floor condition, the preparation work involved and the products being used. Minor repairs and surface smoothing may take less time than extensive levelling or moisture treatment. Some preparation compounds and membranes also require specific curing or drying periods before the new flooring can be installed. The product manufacturer’s instructions should always be followed.

A damp proof membrane is a specialist system used to manage moisture within or passing through a sub-floor. It may be required where moisture testing identifies levels that exceed the permitted limits for the proposed flooring system. The correct solution depends on the substrate, moisture conditions and manufacturer’s guidance, so an assessment should be carried out before selecting a suitable membrane.

Floor smoothing compound is a specialist preparation material applied to a suitable substrate to create a smooth, even surface before new flooring is fitted. It is commonly used to address minor surface imperfections and provide a suitable finish for resilient floor coverings. The appropriate compound depends on the existing substrate, the flooring specification and the manufacturer’s recommendations.

Sub-floor preparation involves assessing and treating the existing surface before a new floor covering is installed. This may include cleaning, repairing damaged areas, removing old adhesive, levelling uneven sections and checking moisture levels. Preparing the substrate correctly helps create a suitable base for the new flooring and reduces the risk of problems affecting its appearance or performance.

Floor screeding generally involves applying a cement-based or specialist screed material to create or improve the underlying floor surface. Floor levelling focuses on correcting variations in height and producing an even surface suitable for the chosen floor covering. Self-levelling compounds are often used during preparation, but the correct system depends on the condition and construction of the existing floor.